Kimberly-Clark Corporation

Nov 2000- Jul 2001: ECI Engineering, Inc.; Daphne, AL
Feb 1996- Nov 1999: Jacobs Engineering; Mobile, AL
May 1993- Feb 1996: BE&K Engineering; Mobile, AL


Contract Engineering Support for Kimberly-Clark’s Mobile, Al. Paper Mill. The contract for this position was held by BE&K Engineering, Jacobs Engineering, and Seacon Engineering. On-site Engineering support for Control Systems in the converting areas of the mill was supported. Capital projects for Kimberly Clark were also supported during this period. Coordination and integration of different vendor’s equipment with the mill’s conveying systems were also required. The Kimberly Clark Mobile Mill has Modicon 984s, Panelmates, ControlLogix, and Panelview-Plus HMIs. Attendance of a 40 hour training class by Rockwell on ControlLogix when it was introduced was also required.