Control Systems Designer responsible for design, programming and start-up of various control system projects. The clients included the Alabama DOT, The City of Saraland, Alabama and The City of Fairhope, Alabama. I configured, programmed and commissioned a new control system on a Draw Bridge in Bayou LaBatre, Alabama. The system used redundant GE Series 90-30 PLCs, and a Wonderware HMI/SCADA workstation for control and monitoring of the bridge systems.
Showing posts with label 2. Work History. Show all posts
Showing posts with label 2. Work History. Show all posts
Kimberly-Clark Corporation
Nov 2000- Jul 2001: ECI Engineering, Inc.; Daphne, AL
Feb 1996- Nov 1999: Jacobs Engineering; Mobile, AL
May 1993- Feb 1996: BE&K Engineering; Mobile, AL
Feb 1996- Nov 1999: Jacobs Engineering; Mobile, AL
May 1993- Feb 1996: BE&K Engineering; Mobile, AL
Contract Engineering Support for Kimberly-Clark’s Mobile, Al. Paper Mill. The contract for this position was held by BE&K Engineering, Jacobs Engineering, and Seacon Engineering. On-site Engineering support for Control Systems in the converting areas of the mill was supported. Capital projects for Kimberly Clark were also supported during this period. Coordination and integration of different vendor’s equipment with the mill’s conveying systems were also required. The Kimberly Clark Mobile Mill has Modicon 984s, Panelmates, ControlLogix, and Panelview-Plus HMIs. Attendance of a 40 hour training class by Rockwell on ControlLogix when it was introduced was also required.
Gulf States Engineering Inc.
Dec 2002 – Nov 2004:
Contracted to Cornerstone Controls, Inc.; Indianapolis, IN
Automation Lead responsible for Computer System Validation deliverables on a project for Eli Lilly. The deliverables included: validation plan, user requirements, functional requirements, system overview, system design, system configuration, source code review, test plan, standards, procedures, test cases/scripts, test protocols, test summary report, security plan, business continuity plan, disaster recovery plan, and validation report. This effort was a small part of the Eli Lilly’s Building 105 turnaround project which included 100 people in the Automation group. Attendance was also required at a 40 hour training class by Rockwell on the new RSView SE.
Oct 2001 – Nov 2002
Gulf States Engineering, Mobile, Al
Responsible for configuring, programming and commissioning the control system for Harrison County Adult Detention Facility in Gulfport, MS. The system consisted of five Allen-Bradley PLC 5/40s, 15 Panelview touch screens and 3 RSView32 workstations on an Ethernet network.
Aug 2001–Oct 2001
Contracted to Cornerstone Controls, Inc.; Indianapolis, IN
The Control Systems Programmer responsible for configuration, programming and FAT of a piece of pharmaceutical equipment. Allen-Bradley PLC-5/40 and RSView32 were used.
Contracted to Cornerstone Controls, Inc.; Indianapolis, IN
Automation Lead responsible for Computer System Validation deliverables on a project for Eli Lilly. The deliverables included: validation plan, user requirements, functional requirements, system overview, system design, system configuration, source code review, test plan, standards, procedures, test cases/scripts, test protocols, test summary report, security plan, business continuity plan, disaster recovery plan, and validation report. This effort was a small part of the Eli Lilly’s Building 105 turnaround project which included 100 people in the Automation group. Attendance was also required at a 40 hour training class by Rockwell on the new RSView SE.
Oct 2001 – Nov 2002
Gulf States Engineering, Mobile, Al
Responsible for configuring, programming and commissioning the control system for Harrison County Adult Detention Facility in Gulfport, MS. The system consisted of five Allen-Bradley PLC 5/40s, 15 Panelview touch screens and 3 RSView32 workstations on an Ethernet network.
Aug 2001–Oct 2001
Contracted to Cornerstone Controls, Inc.; Indianapolis, IN
The Control Systems Programmer responsible for configuration, programming and FAT of a piece of pharmaceutical equipment. Allen-Bradley PLC-5/40 and RSView32 were used.
Seacon Engineering Inc.
November 2004 – Present - Mobile, Al.
Control Systems Programmer responsible for designing, configuring, programming and commissioning industrial automation projects utilizing RSLogix 5000, Allen-Bradley ControlLogix, Factory Talk View ME, RSView ME, RSView 32, Panelbuilder, and Wonderware. Drive replacement projects on Continuous Winders using ControlNet, Powerflex Drives and 3-axis motion control. A new converting line with 48 Powerflex VFDs on ControlNet, Ethernet communication to RSView ME HMI/SCADA stations and Vendor equipment was supported. Another project required experience with Kinetix 6000 servo drives, Ultra 3000 with SERCOS.
Control Systems Programmer responsible for designing, configuring, programming and commissioning industrial automation projects utilizing RSLogix 5000, Allen-Bradley ControlLogix, Factory Talk View ME, RSView ME, RSView 32, Panelbuilder, and Wonderware. Drive replacement projects on Continuous Winders using ControlNet, Powerflex Drives and 3-axis motion control. A new converting line with 48 Powerflex VFDs on ControlNet, Ethernet communication to RSView ME HMI/SCADA stations and Vendor equipment was supported. Another project required experience with Kinetix 6000 servo drives, Ultra 3000 with SERCOS.
RedCastle Manufacturing; Mansfield, Texas
June 15, 2009
This is a three week project, programming a series of skid mounted devices that will fill batteries with acid when we're done. There is a SLC-505, Panelview, and much of the I/O is on an AS-i network. It is really a complex little project, but other than the heat it's been fun.
Of all of the places I've worked, I've never felt so comfortable with a new group of people. By nine or ten o'clock the first day I felt like I've always been here. Very nice, eclectic group of people.
This is a three week project, programming a series of skid mounted devices that will fill batteries with acid when we're done. There is a SLC-505, Panelview, and much of the I/O is on an AS-i network. It is really a complex little project, but other than the heat it's been fun.
Of all of the places I've worked, I've never felt so comfortable with a new group of people. By nine or ten o'clock the first day I felt like I've always been here. Very nice, eclectic group of people.
Automation Technology, Inc.
Mar 1984 – May 1993: Mobile, AL
Control systems designer responsible for design, programming, checkout and start-up of projects over a nine-year period.
Control systems designer responsible for design, programming, checkout and start-up of projects over a nine-year period.